T.R.E.A.T.Y. School Update #3

March 1, 2009 by  
Filed under T.R.E.A.T.Y. School

TREATY School Update #3

Dear Fellow Freedom Lovers and T.R.E.A.T.Y. Total Immersion School Supporters,

We have received many inquires as to the status of the school project so we are writing today to share a fuller update than the previous two. Over the last several years, Russell and Pearl Means have laid a solid foundation for this project, including traveling to New Zealand to investigate the Total Immersion educational philosophy in action.
This method of preserving indigenous cultures has been very successful there. “In the early 1980s, the Maori people of New Zealand began a dynamic language revitalization movement. The establishment of Maori immersion programs in state funded schools constituted one major aspect of the movement.

In 1985, the first immersion classroom of 5-year-olds was established. Immersion classrooms were added year by year as the first class of children progressed through primary school, junior high, and high school. The first class completed the final year of high school in 1997, and students entered polytechnics or university programs in 1998.
READ MORE AT: http://www.russellmeansfreedom.com/?p=1051

Achievements to Date:

T.R.E.A.T.Y School and Ranch

  • Purchasing of 160 acres of land.
  • Phase I Construction of the School Building at a cost of $160,000.00.
  • Purchase and breeding of “papered” Lakotah bred Mustangs (16 hands) which now number 13 with three more to be born in the spring.
  • Purchase and remodeling of the Administration building.
  • Development of volunteers including:
  1. David Grefrath, who now serves as our volunteer coordinator. build@treatyschool.org
  2. Dezeray Rubinchik & Brian Bucher who have been working tirelessly to assemble volunteers and secure funding:
    The Better World Project
    projectbetterworld@yahoo.com
    www.freewebs.com/theprojectforabetterworld
    www.myspace.com/projectforabetterworld
    215-806-7844
  3. Eric Klein of www.can-do.org who is organizing the construction of the greenhouses.
  4. and many, many generous supporters who have donated time and money to support these efforts.

Next Steps:

  1. We will be finishing the construction of the T.R.E.A.T.Y. Total Immersion School as well as building a prototype of compressed earth, sustainable dormitory building.
  2. Installation of wind turbines.
  3. Construction of two greenhouses to provide a biology lab for the students as well as nutritious foods.
  4. We will need carpenters, electricians, plumbers, painters, excavators (septic system), solar technicians, wind turbine technicians, cooks, labors, architects, engineers.
  5. Construction will begin with the laying of foundations in May and continue through August.
  6. If you wish to join in these projects, e-mail David Grefrath at build@treatyschool.org
  7. Implementation of www.onecause.com on-line shopping and donation program:

Online Shopping with OneCause

MAKE A DONATION TO THE T.R.E.A.T.Y. TOTAL IMMERSION SCHOOL

Preliminary 3-D Renderings

T.R.E.A.T.Y. Total Immersion School Energy Plan:

  1. PHASE I – The School Project has been expanded to include a dorm building and a wind turbine. Click to view a preliminary 3-D fly around showing the TREATY Total Immersion School Ranch and Dormitory Building. The dorm will be used to house volunteers and teachers involved with the project. As you can see, there is also a wind turbine depicted on a bluff overlooking the school. This will be a 10 – 30 KW turbine utilizing a micro-hydroelectric plant situated in an adjacent ravine for power storage. Additionally, the turbine is sized large enough to generate excess power which can be sold back to the grid and thus develop revenue for the school.
  2. PHASE II - Here we intend to build a small scale wind farm to both generate endowment money for the construction of additional schools and to demonstrate to the local government our expertise. At this phase, we would also begin training a team of local Lakotah to install and maintain the turbines.
  3. PHASE III - Construction of a small, community-based wind farm in the Village of Wounded Knee, which has about 700 residents. This facility would utilize a privately owned grid and be designed to provide free electricity to the residents and generate income for additional projects.
  4. PHASE IV – Here we plan to develop a full-scale commercial wind farm adjacent to the 115,000 volt power transmission line which runs east/west through the Pine Ridge Reservation. We intend to form a Lakotah energy cooperative which would sale power via contracts, thus bypassing the local power monopoly on the web. IF WE CAN MANIFEST THIS VISION, this Phase will generate enough revenue to begin the construction of the approximately 100 Schools which will be needed to serve all 13 Lakotah Reservations!

We are currently in negotiations with the Renewable Energy Institute affiliated with Texas Tech Univesity to add professional expertise to our team. Additionally, we are in contact with several wind turbine companies seeking both technical assistance and partners for joint ventures.

  • Advertisement